Sample Maintenance Policy for Electrical Equipment (Template)

 

  1. PURPOSE:

    To establish the system for the maintenance of electrical equipments and to ensure that the equipments are available continuously for preventive maintenance. 
     

  1. SCOPE:

 
 

    This is applicable to the preventive & breakdown Maintenance of electrical equipment of Foil. 
     

  1. DEFINITIONS:

 
 

          Dy.General Manager  -     Deputy General Manager

          Asst.Manager             -      Assistant Manager

          PMI                            -      Preventive Maintenance Incharge

          I.D. No.            -      Identification Number

          P.M                            -      Preventive Maintenance 
     

  1. RESPONSIBILITY:

 
 

    1. Head of department is over all responsible for implementing this procedure.

    2. Personal performing breakdown maintenance shall not carry out preventive maintenance.

    3. Individual responsibilities of specific activities are described here after.

 
 

  1. PROCESS INPUT:

 
 

    1. Work instruction for carrying out maintenance activities.

    2. Intimation of breakdown by work order

    3. P.M.Slippage Record

    4. P.M.Schedule

    5. PM Checklist

    6. P.M.Schedule cum check sheet

 
 

  1. PROCESS DESCRIPTION & INTERFACES:

      1. Preventive maintenance: -

 
 

Sr. No.

Activity

Responsibility

Ref. Doc.

1

All the equipments requiring periodicmaintenance will be identified and a list will be prepared.

Asst.Manager

FQMNT02F01

2

A unique I.D.No. Will be given to them.

Asst.Manager

FQMNT02F01

3

The frequency of maintenance will be decided on the basis of

  • Manufacture recommendation

         Decided by maintenance Department

Asst.Manager

Operation &Maintenance Manual FQMNT02F06

4

The P.M. schedule/P.M.Schedule cum check sheet will be made as per the    identified frequency above.

Asst.Manager

FQMNT02F06 FQMNT02F18

5

The equipment will be spared and the preventivemaintenance will be carried out as per P.M check list/ P.M.Schedule cum check sheet & relevant work instruction.

Asst.Manager/PMI/ Sr.Formen/

Foreman

FQMNT02F07, FQMNT02W03, FQMNT02W10, FQMNT02W12 FQMNT02F18,

FQMNT02W05

6

The P.M. checklist / P.M.Schedule cum check sheet will be filled up after completingmaintenance.

PMI

FQMNT02F07, FQMNT02F18

7

In case of any schedule getting delayed due to any reasons or preventive action if not carried out, should be recorded in the   P.M slippage record.

PMI

FQMNT02F08

8

Review the P.M. schedule at least Six monthly for types of checks & frequency on the basis of its effectiveness.

Asst.Manager/PMI

FQMNT02F03, FQMNT02F04

9

Review the P.M.slippage record monthly & to avoid the frequency of slippage.

Asst.Manager/

PMI

FQMNT02F08

10

In a case of overhauling required, for the equipment, follow the respective work instruction/Vendor instruction manual and filled the over hauling check list.

Sr. Foreman/ Foreman

Operating andmaintenance manual, FQMNT02W09, FQMNT02W07

FQMNT02F19

 
11 
 
 

Operation of DG SET, Circuit breaker, 66KVSwithyard,HT Capacitor bank and power changeover done as per work instruction. 
 

 
Shift foreman 
 

 
FQMNT02W01

FQMNT02W02

FQMNT02W04

FQMNT02W08 FQMNT02W11

    B.     BREAKDOWN: -

 
 

Sr. No.

Activity

Responsibility

Ref. Doc.

1

Receiving work order from user department regarding breakdown of any equipment.

Shift Incharge

 

2

Review the problem and allocate the job to concern person.

Asst.Manager/

Shift Incharge

 

3

Carry out the breakdown maintenance. As per work instruction.

Sr.Forman/ Shift Incharge/Foreman

FQMNT02W06

4

Prepare daily breakdown report and sent copy to Dy.GM (Mech) & GM (F&A).

Sr.Forman /Foreman

FQMNT02F03

5

Prepare monthly breakdown report and sent copy to V.P. (foils), all Deptt. Heads, MIS & PPC.

Sr.Forman /Foreman

FQMNT02F04

  1. PROCESS OUT PUTS:

    1. Continue availability of machine.

    2. Relevant reports & records of equipments.

    3.          P.M.Slippage Record.

 
 

  1. PROCESS MONITORING:

 
 

Sr. No.

Description

Frequency

Responsibility

1

Review of P.M. schedule.

Six monthly

Asst.Manager

2

Review P.M.slippage record.

Monthly

Asst.Manager

 
 

  1. RECORDS:    

     

Sr.No.

Record No.

Record Title

Retention period

Location

Disposal authority

1

FQMNT02F01

COMPREHENSIVE EQUIPMENT LIST

Till the equipment Last

ELECTRICAL SHOP FLOOR

Dy. General Manager

2

FQMNT02F02

EQUIPMENT HISTORY RECORD

Till the equipme

nt Last

ELECTRICAL SHOP FLOOR, MSDS&ERS

Dy. General Manager

3

FQMNT02F03

DAILY BREAKDOWN REPORT

Six Months

ELECTRICAL SHOP FLOOR

Dy. General Manager

4

FQMNT02F04

MONTHLY BREAKDOWN REPORT

1Year

ELECTRICAL SHOP FLOOR

Dy. General Manager

5

FQMNT02F05

MAJOR BREAKDOWN ANALYSIS REPORT

1Year

ELECTRICAL SHOP FLOOR

Dy. General Manager

6

FQMNT02F06

PM SCHEDULE

1Year

ELECTRICAL SHOP FLOOR/MSDS

Dy. General Manager

 
 

 

7

  FQMNT02F07

FQMNT02F07/ 01

FQMNT02F07/ 02

FQMNT02F07/ 03

FQMNT02F07/ 04

FQMNT02F07/ 05

FQMNT02F07/ 06

FQMNT02F07/ 07

FQMNT02F07/ 08

FQMNT02F07/ 09

FQMNT02F07/ 10

FQMNT02F07/ 11

FQMNT02F07/ 12

FQMNT02F07/ 13

FQMNT02F07/ 14

FQMNT02F07/ 15

FQMNT02F07/ 16

FQMNT02F07/ 17

FQMNT02F07/ 18

FQMNT02F07/ 19

FQMNT02F07/ 20

FQMNT02F07/ 21

FQMNT02F07/ 22

FQMNT02F07/ 23

FQMNT02F07/ 24

FQMNT02F07/ 25

FQMNT02F07/ 26

FQMNT02F07/ 27

FQMNT02F07/ 28

FQMNT02F07/ 29

FQMNT02F07/ 30

FQMNT02F07/ 31

P.M.CHECK LIST:-

MILL M50

MILL M51

MILL M52

MILL Q4

MILL Q5

CRANE # 1

CRANE # 2

CRANE # 3

CRANE # 4

CRANE # 5

CRANE # 6

CRANE # 7

CRANE # 8

CRANE # 4A

REWIND LINE # 1

REWIND LINE # 2

REWIND LINE # 3

BAILING PRESS

ROLL GRINDER

ANN. FURNACE # 1

ANN. FURNACE # 2

ANN. FURNACE # 3

ANN. FURNACE # 4

OVEN # 1

OVEN # 2

OVEN # 3

SEPARATOR # 25

SEPARATOR # 26

DOWN ENDER

FUME EXH. SYSTEM

H G SLITTER

 
 
 
 
 
 
 
 
 
 
 
 
 
1Year

 
 
 
 
 
 
 
 
 
 
 
 
 
ELECTRICAL SHOP FLOOR/MSDS

 
 
 
 
 
 
 
 
 
 
 
 
 
Dy. General Manager

 
 

 

 
FQMNT02F07/ 32

FQMNT02F07/ 33

FQMNT02F07/ 34

FQMNT02F07/ 35

FQMNT02F07/ 36

FQMNT02F07/ 37

FQMNT02F07/ 38

FQMNT02F07/ 39

FQMNT02F07/ 40

FQMNT02F07/ 41

FQMNT02F07/ 42

FQMNT02F07/ 43 FQMNT02F07/ 44

 
M G SLITTER

L G SLITTER

DOCTOR REWINDER

DRY BOND LAM.

PRINTING MACHINE

EXTRUDER COATER

MAIN PUMP HOUSE

COOLING TOWER

NITROGEN GEN.

FIRE HYDRANT

W.T.P.

VENT. SYSTEM

COMP. HOUSE

 
1 Year

 
ELECTRICAL SHOP FLOOR/MSDS

 
Dy.

General

Manager

8

FQMNT02F08

P.M.SLIPPAGE RECORD

1Year

ELECTRICAL SHOPFLOOR/MSDS

Dy. General Manager

9

FQMNT02F09

WORK ORDER

3 Month

ECR Q4/Q5, ERS& MSDS

Dy. General Manager

10

FQMNT02F10

WORK PERMIT

3Month

ECR Q4/Q5, ERS& MSDS

Dy. General Manager

11

FQMNT02F11

OVERHAULING SCHEDULE

1 Year

MSDS / ERS

Dy. General Manager

12

FQMNT02F12

SHIFT LOG BOOK

1YEAR

Q4/Q5 CONTROL ROOM

Dy. General Manager

13

FQMNT02F13

DAILY ENERGY GENERATION /CONSUMPTION REPORT

Six Months

MSDS

Dy. General Manager

 
 

14

FQMNT02F14

STATEMENT SHOWING ENERGY GENERATED & CONSUMED INCLUDING CONSUMPTION OF DIESEL

1Year

MSDS

Dy. General Manager

15

FQMNT02F15

DG LOG BOOK

1Year

MSDS

Dy. General Manager

16

FQMNT02F16

ANALYSIS OF MOTOR FAILURE

1Year

ERS

Dy. General Manager

17

FQMNT02F17

ELECTRICAL POWER CONSUMPTION REPORT

1Year

ELECTRICAL SHOP FLOOR

Dy. General Manager

18

FQMNT02F18 
 

FQMNT02F18/ 01

FQMNT02F18/ 02

FQMNT02F18/ 03 
 

FQMNT02F18/ 04 
 

FQMNT02F18/ 05

FQMNT02F18/ 06

FQMNT02F18/ 07 
 

FQMNT02F18/ 08

FQMNT02F18/ 09

FQMNT02F18/ 10 
 

FQMNT02F18/ 11

PM SCHEDULE CUM CHECK SHEET: -

LT air circuit breaker

66 kv CT, PT, CVT & LA

LT APFC panel, HT capacitor bank & reactor

Battery bank & battery charger

11 kv & 132 kv MOCB

11 kv T.M.G. ACB

11 kv ABB (indoor & outdoor) & Siemens VCB

66 kv Sf6 circuit breaker

22 kv Sf6 circuit breaker

11 kv, 22 kv & 66 kv isolators

11 kv, 1500 kva DG set

1Year

MSDS

Dy. General Manager

 
 

    

FQMNT02F18/ 12 
 

FQMNT02F18/ 13

FQMNT02F18/ 14

FQMNT02F18/ 15

Power & distribution transformer

415 v, 125 kva DG set

Sub- station (monthly)

Sub- station (fortnight)

1Year

MSDS

Dy. General Manager

   19

FQMNT02F19

OVER HAULING CHECK LIST

3 Years

ERS

Dy. General Manager

 
 

10. REFERENCE : 
 

Sr.No.

Document no.

Work instruction

1

FQMNT 02W01

OPERATION OF D.G.SET

2

FQMNT 02W02

OPERATION OF 66KV SWITCH YARD

3

FQMNT 02W03

OPERATION AND MAINTENANCE OF BATTERY BANK

4

FQMNT 02W04

OPERATION OF H.T CAPACITOR BANK

5

FQMNT 02W05

OPERATION AND MAINTENANCE OF TRANSFORMER

6

FQMNT 02W06

BREAKDOWN MAINTENANCE

7

FQMNT 02W07

OVER HAULING OF D.C. MOTOR

8

FQMNT 02W08

POWER CHANGE OVER

9

FQMNT 02W09

OVER HAULING OF A.C. SLIPRING MOTOR

10

FQMNT 02W10

MAINTENANCE OF DIESEL GENERATOR

11

FQMNT 02W11

OPERATION OF CIRCUIT BREAKER

12

FQMNT 02W12

PREVENTIVE MAINTENANCE